
Dubai Maritime City (DMC) has awarded Syncrolift, the world’s leading manufacturer of ship lifts and transfer systems, a major contract to upgrade its shipbuilding and shiprepair facilities so that they will reach a capacity of 2000 docking/undocking operations per year.
Located near Mina Rashid in Dubai, DMC currently has two ship lifts which transport ships to dry berths so that businesses located on site, including Grandweld, Albwardy Damen, and many others can provide shipbuilding and repair services. One of the lifts has 28 hoists and is capable of lifting vessels up to 6000 tonnes and 130 m in length. The other has 14 hoists and can lift vessels up to 3000 tonnes and 90 m in length.
The project is expected to cost AED 38 million and take 450 days to implement. Upon completion, it will boost DMC’s total ship handling capacity from 800 to 2000 per year. Lloyd’s Register, the renowned classification society, will supervise the entire project from the design phase to final delivery.
Other Stories

TMS Newsletter reaches 300th edition milestone

The Maritime Standard Awards 2026 Celebrates Maritime Excellence in a Landmark Dubai Ceremony

The Maritime Standard Tanker Conference 2026 concludes, addressing the industry’s evolving priorities

New vessels and higher freight rates mean Asyad Shipping results continue to impress





















